Assessment of Hazardous Materials and implementing corrective action plan for multiple high-rise buildings in downtown Toronto per City Park Asbestos Management Program and in compliance per the Occupational Health and Safety Act, Ontario Regulation 278/05 Designated Substance — Asbestos on Construction Projects and In Buildings and Repair Operations.
This project to assess of indoor air quality and evaluate the air handling system for recommendation to improve to be able to accommodate the increased occupancy after COVID 19 pandemic for CBC Building all over the Canada. This include the investigation of microbial assessment and recommending remedial / corrective action in accordance with the applicable regulations and guidelines.
SHARP program was initiated to upgrade the existing building energy systems to an efficient green system. My role was to overall manage this project to facilitate the implementation of SHARP program. Activities included ; • Design and recommendation of procedures for handling the hazardous materials and make certain of air handling system protect the ambient air from contaminations and to mitigate the risk of cross-contamination during execution. Air quality assessment during project execution.
welding process hazards evaluation, site characterization for identification of hazards, design of sampling parameters and selection of sampling media and equipment, interpretation of sampling analytical results, Report writing and recommendation for engineering control and use of personal protective equipment. Assessment of effectiveness of existing ventilation system. Design of new local exhaust ventilation system including fans, ducting system.
Designing a mechanical ventilation/exhaust system to provide solution to the environmental concern of the natural formation of methane/other subsoil gases. including Identification evaluation, and control processes. Analysis and interpretation of analytical results qualitatively and quantitatively. • Design calculation for local exhaust ventilation system including Geovent system to redirect subsoil gases to an elevated stack for appropriate dispersion.
design execution and commissioning of a ventilation/exhaust system to provide solution to the environmental concern of the natural formation of radon and other subsoil gases.